Skip to content
1842 N Knoxville Avenue, Peoria, IL 61603Monday – Friday: 7 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.Roofing Contractor · IL Lic. 000000VerifyGeneral liability insurance
1 more license
  • Roofing Contractor · IL Lic. 000000Verify
  • General liability insurance
(309) 555-0100

Re-roofing

A new roof, one layer at a time

Asphalt shingles, torn off to the deck, rebuilt under written terms.

A re-roof is a few days of loud work after weeks of deciding. My part is to keep the deciding short and the loud part tidy.

Every job starts with the visit and the written page. After you sign, I order materials, pull the permit if your town asks and give you a start day that holds unless the weather says otherwise.

  • Tear-off to the deck, not over old layers

  • Deck checked, bad sheets priced per sheet

  • Ice barrier, underlayment, flashing and vents in the plan

A dark asphalt shingle roof edge above a cedar-shingle wall with autumn leaves

Is it time?

Signs the roof is near the end

  • 01

    Age

    Around 20 years for 3-tab shingles and 25 to 30 for architectural. Past that, I start looking harder.

  • 02

    Curling or missing shingles

    Edges lifting, bare patches, or shingles that crack when I press them.

  • 03

    Grit in the gutters

    Granules from the shingle surface washing down is wear, and it shows.

  • 04

    Stains and daylight in the attic

    Brown rings on the deck, damp insulation, or light coming through.

The job

A re-roof, day by day

Most houses take one to three days. A big, steep or complicated roof takes longer.

  1. 01

    Step 1: Before the crew comes

    Move cars out of the driveway, take fragile things off walls and cover what's in the attic. I'll send a reminder with the start day.

  2. 02

    Step 2: Day one: tear-off

    Old shingles and underlayment come off in sections we can dry in the same day. Dumpster and tarps go where we agreed.

  3. 03

    Step 3: Deck check

    I walk the bare deck with you or by phone. Bad sheets are replaced at the price on the page.

  4. 04

    Step 4: Day two: the new roof

    Ice barrier, underlayment, drip edge, flashing, then shingles from the eave up. Vents go in as we go.

  5. 05

    Step 5: Day three: ridge and cleanup

    Ridge caps, a last look at every penetration, and a magnet sweep of the yard and driveway.

  6. 06

    Step 6: After

    Pawel walks the roof line with you. Your warranty papers follow, with the registration done.

What goes on

Two shingle kinds, and how long each lasts

  • 3-tab

    Flat, one layer thick, the lower price. About 15 to 20 years in the Midwest.

    • Good for a small shed or a short-term house

    • Shows wear sooner under summer sun

  • Architectural

    Thicker, with a layered look. About 25 to 30 years with good ventilation.

    • My usual recommendation for a family home

    • Heavier, so the deck matters more

Want to see it on your roof?

The visit takes about an hour, and the written page comes the next day.